Operations
Arbroath
View in Provision of Information
Arbroath
Key Facts
- Status
- Producing
- Structure
- Four legged steel jacket supported platform
- Location
- North Sea block 22/17B. 130miles/209km east of Aberdeen, approximately 5 miles south east of Montrose Platform.
- Date installed
- 1989, first production 1990
- Accommodation capacity
- 25
- Water depth
- 92.7 metres
- Lower deck height above sea level
- 17m
- Number of platform wells
- 18
- Number of subsea wells
- 5
Key Facts
- Status
- Producing
- Structure
- Fixed steel jacket platform, weighing 12,340 Tonnes
- Location
- UKCS Block 30/16 Latitude 56° 24'1.38” N, longitude 02° 03'47.7” E 155 miles, (249km) east south east of Aberdeen. Approximately 1 hour 30 minutes flying time from Aberdeen airport
- Date installed
- 1974, first production 1975
- Accommodation capacity
- 71
- Water depth
- 83 metres
- Lower deck height above sea level
- 21 metres
- Number of platform wells
- 11
Beatrice
Beatrice
Key Facts
- Status
- Ceased production 2015
- Structure
- Fixed steel jackets: (A) (Twin platforms AP & AD); (B) (Drilling & water injection); (C) (Water injection)
- Location
- UKCS Block 11/30a, 75 miles, (122km) north west of Aberdeen. Approximately 40 minutes flying time from Aberdeen airport
- Date Installed
- 1978, first production 1981
- Accommodation capacity
- Alpha 103, Bravo 20, Charlie 10
- Water depth
- Alpha 45m, Bravo 46m, Charlie 50m
- Number of platform wells
- 30 Alpha, 11 Bravo, 2 Charlie
Bleo Holm
View in Provision of Information
Bleo Holm
Key facts
- Status
- Producing
- Structure
- Ship shaped Mono-Hull Floating Production and Storage Offloading (“FPSO”)
- Location
- UKCS Block 13/28a, 58 27’ N, 01 26’ W, 72 miles (116km) north east of Aberdeen. Approximately 25 minutes flying time from Aberdeen
- Date installed
- 1999, first production 1999 (Ross Field), Blake Field online 2001
- Accommodation capacity
- 79
- Water depth
- 100 metres
- Number of platform wells
- Blake 6, Ross 3
Buchan
Buchan
Key Facts
- Status
- Suspended production 2017; facility being disposed of in Lerwick, Shetland
- Struture
- Pentagonal shaped semi-submersible
- Location
- The Buchan field lies in block 20/5a & 21/1a, 154 km north east of Aberdeen.
- Date installed
- 1980, first production 1981
- Accommodation capacity
- 88
- Water depth
- 116 metres
- Number of platform wells
- 5
- Number of subsea wells
- 5
Claymore
View in Provision of Information
Claymore
Key facts
- Status
- Producing
- Structure
- Two fixed steel bridge-linked production – Claymore Production Platform (“CPP”) and Claymore Accommodation Platform (“CAP”)
- Location
- UKCS Block 14/19, 100miles/ 161 km north east of Aberdeen. Approximately 60 minutes flying time from Aberdeen airport
- Date installed
- 1976, first production 1977
- Accommodation capacity
- 250
- Water depth
- 110 metres
- Lower deck height above sea level
- 30 metres
- Number of platform wells
- 29
- Number of subsea wells
- 7
Clyde
Key facts
- Status
- Producing
- Structure
- Fixed steel jacket platform weighing 30,400 tonnes
- Location
- UKCS Block 30/17b,175 miles, (280km) south east of Aberdeen. Approximately 1 hour 15 minutes flying time from Aberdeen airport
- Date installed
- 1986, first production 1987
- Accommodation capacity
- 195
- Water depth
- 81 metres
- Lower deck height above sea level
- 20 metres
- Number of platform wells
- 16
- Number of subsea wells
- 3
Flotta
Key facts
- Status
- Operational
- Location
- Flotta, Orkney Islands, covering 395 acres of the island’s 2,319 acres
- Commissioned
- January 1977
- Storage
- Oil – 4.5 million barrels
- LPG
- 100,000 barrels
- De-ballast water
- 1 million barrels
- Accommodation capacity
- 110 beds
- Current manning levels
- 179 core crew divided into separate shifts. 140 average daily POB including ad hoc manning
Fulmar
Key facts
- Status
- Ceased production
- Structure
- Fixed steel jacket platform
- Location
- UKCS Block 30/16, 217 miles (350 km) east of Dundee. Approximately 1 hour 20 minutes flying time from Aberdeen airport
- Date installed
- 1980, first production 1982
- Accommodation capacity
- 222
- Water depth
- 83 metres
- Lower deck height above sea level
- 21 metres
- Number of platform wells
- 14
- Number of subsea wells
- 4
Montrose
View in Provision of Information
Montrose
Key facts
- Status
- Producing
- Structure
- Montrose: Eight legged steel jacket supported platform weighing 21,176 Tonnes; BLP (Bridge Linked Platform): Four legged steel jacket (weighing 5,745 Tonnes) supported platform weighing 10,500 Tonnes
- Location
- North Sea Block 22/17B. 130 miles/209km east of Aberdeen. Approximately 60 minutes flying time from Aberdeen airport
- Date installed
- Montrose: 1975, first production 1976; BLP: 2016, first production 2017
- Accommodation capacity
- 116
- Water depth
- 91.4 metres
- Lower deck height above sea level
- Montrose: 21m; BLP: 24.5m
- Number of platform wells
- Montrose: 23; BLP: 0
- Number of subsea wells
- Montrose: 1; BLP: 3
Piper
Key facts
- Status
- Producing
- Structure
- 8 legged steel jacket weighing a total of 57,800 tonnes
- Location
- UKCS Block 15/17. 120 miles/193km north east of Aberdeen Approximately 1 hr 10 minutes flying time from Aberdeen airport
- Date installed
- 1992, first production 1993
- Accommodation capacity
- 180
- Water depth
- 145 metres
- Number of platform wells
- 11
- Number of subsea wells
- 3
Saltire
Saltire
Key facts
- Status
- Ceased production 2016 (formally – had not produced since 2014)
- Structure
- 4 legged steel jacket weighing a total of 35,000 tonnes
- Location
- UKCS Block 15/17. 125 miles/201km north east of Aberdeen
- Date installed
- 1992, first production 1993
- Accommodation capacity
- 81
- Water depth
- 145 metres
- Number of platform wells
- 15
- Number of subsea wells
- 3
Tartan
Key facts
- Status
- Non-producing
- Structure
- Four legged steel jacket supported platform weighing 28,490 Tonnes
- Location
- UKCS Block 15/16a and 14/20a.117 miles north east of Aberdeen, 90 miles north east of St Fergus, Tartan is approximately 59 minutes flying time from Aberdeen airport
- Date installed
- 1979, first production 1981
- Accommodation capacity
- 98
- Water depth
- 140 metres
- Lower deck height above sea level
- 30 metres
- Number of platfrom wells
- 5
- Number of subsea wells
- 7
Overview
Based in Aberdeen, Scotland, we have interests in 48 fields, of which we operate 38, on the UK Continental Shelf with 11 offshore installations and two onshore terminals.
Our assets include producing oil fields, major new developments and a number of assets that have ceased production or are approaching decommissioning.
The safety of our people, integrity of our assets and protection of the environment are our top priorities.